.....Advertisement.....
.....Advertisement.....

BULLITT COUNTY ROADWORK: Week of April 12

-A A +A
By The Staff

The Kentucky Transportation Cabinet Highway District 5 reports the following roadwork scheduled in Bullitt County for the week of April 12:

 

 

Bullitt County:

Interstate 65:  Shoulder closures and delays possible between mile points 109 and 116 for installation of median cable barriers.

 

 

Jefferson County:

Interstate 264 (Watterson Expressway):  Lane closures and delays possible between US 60 (Shelbyville Road) and US 42 (Brownsboro Road), mile points 19.8 and 22.2, for construction of an interchange at Westport Road.  The speed limit will be reduced to 45 MPH in the construction zone.  Lane closures and delays are also possible on Westport Road between Hubbards Lane and I-264 (mile points 0.9 and 1.9).  Speed limit on Westport Road has been reduced to 25 MPH in the construction zone.  

Interstate 71:  Shoulder closures and delays possible between mile points 8 and 11 for work on the TRIMARC expansion.

KY 146 (LaGrange Road):  Lane closures and delays possible between Bellwood Road and Glenbrook Road (mile points 4.7 and 5.4) for roadway resurfacing.  Lane closures will occur weekdays from 9 a.m. to 3 p.m. and 6 p.m. to 10 p.m.  Weekend lane closures will occur from 8 a.m. to 10 p.m.

 

 

All roadwork scheduling is subject to change due to inclement weather or other unforeseen circumstances. For more information call Kentucky Transportation Cabinet Highway District 5, (502) 210-5400.